| Brand Name: | Wellman | 
| Model Number: | SMD-T | 
| MOQ: | 1 | 
| Price: | 25000 USD-30000 USD | 
| Payment Terms: | T/T | 
| Supply Ability: | 8 units 90 days | 
| Material type | SMD reel | 
|---|---|
| Batch loading | Yes | 
| Code scanning | Barcode and QR code | 
| Standard capacity | 750pcs (7"&10mm reel) | 
|---|---|
| Capacity after heightening | 1120pcs (7"&10mm reel) | 
| Single reel cycle time | 12-15s | 
| Cycle time after heightening | 12-16s | 
| Mini height | 5mm | 
| Max height | 25mm (customizable) | 
| Max weight | 3KG (customizable) | 
| Multi-tower connection | Support | 
|---|---|
| WMS management | Yes | 
| Temperature and humidity warning | Support | 
| Operation system | Windows 10 | 
| Chip mounter communication | Optional | 
| Management systems connection | MES, ERP, WMS etc. | 
| Dimensions | 1450mm (L) × 1900mm (W) × 2050mm (H) | 
|---|---|
| Height after heightening | 2700mm | 
| Weight | 1500KG | 
| Weight after heightening | 2000KG | 
| Power supply | 220VAC, 16A | 
| Power | 3000W | 
| Industrial PC | I5 CPU, 8G RAM, 240G SSD+1T HDD | 
| Displayer | 17" touch screen | 
| Working temperature | 0 - 40°C | 
| Working humidity | 10 - 85% | 
| Noise | 50dB | 
| Air pressure | 0.5-0.7mpa | 
| N2 interface | Support | 
| Material management | Transform the unique code for new incoming material, add to the total material table | 
|---|---|
| Tower setup | Set up new SMD tower and its locations | 
| Supplier info | Supplier info management, add, delete or search | 
| Customer Info | Customer info management, add, delete or search | 
| Inventory management | Intelligent management of overall inventory | 
| Inventory freeze | Freeze specific locations | 
| Inventory verification | Take stock and update the data of stored reels | 
| Scan the code and load | Scan the reel code and put into location | 
| Location parameter table | Record the coordinate and size info of each location | 
|---|---|
| Current SMD tower table | Record the status of each location of the current SMD tower | 
| In & out record | Record all records of material bin and material tray for traceability | 
| Operation record | Record initialization, power on and off, alarm and other operations | 
| Initialization | Initialize when the machine power on | 
|---|---|
| Single reel in | Put the reel on the designated position, load it in the tower after scanning code | 
| Single reel out | Search for the specified reel, send it out | 
| Batch loading | Load the reels into the tower in batches automatically | 
| Place production orders | According to the production demand, upload the P/N or unique ID to the system for analysis, then lock the reels, and inform each SMD tower to unload | 
| Unload to order | After receiving the production order of the system, unload the reels in batches | 
| Lock expired reels | Lock the expired reels, prevent them from entering the production process |